Add a Horizontal Railing to the Guardrail in 2 Steps:
The installation process of Pipe Handrail Fittings is very simple. Users can easily build a solid guardrail, handrail, or the structure they want. When installing 148 Short Swivel Tee, only takes 2 steps. Step 1: Put two 148 Short Swivel Tees on the uprights as shown in the picture; after adjusting the angle, tighten the two bolts on the upright. Step 2: Insert one end of the pipe to be added into the socket, and tighten the screw on the socket. This completes the connection of the structural pipe fittings.